3000字原创英文论文
预备役军人-
Sponsorship Program
John:
Part 1-3
Jane:
Part 4-6
(Appendix I, together)
Part 1 Overview of the
concert
1.1
the purpose of music festivals
(1) to build long-term
stable and influential campus original music
platform;
(2) to excavate
the campus music talent and promote original
campus development;
(3) to
promote the communication and exchange between
music schools, music and media.
更多精彩内容来自
文星论文网
1.2 concert style
Style in the
outh + Fashion
+ passion + creativity
campus in a wide
range of features of original music groups.
1.3 Form of
music festival
(1)
Performance Type: Original;
(2)
starred
in
selected
15
excellent
bands
in
more
than
10
units
including
40
colleges
and
universities in Greenwich;
(3)
In
addition
to
the
campus
outside
the
original
singer,
then
there
are
well-known
singers
to
participate in music add to the fun;
(4) Performance time: June
14, 2010
18:30
(5) Location: Greenwich Park
(6) guidance units:
Greenwich University Propaganda
(7) Organizers: Greenwich University of
Arts
(8) Sponsor: Institute
of Cultural Industry
, Greenwich
University
(9) Moderator: AA
(moderator of MTV music television channel)
BB (student in Greenwich
university)
(10) Ticket price:
£
40
(11) Audience
capacity: 10,000 people
更多精彩内容来自
文星论文网
Part 2 Pre-preparation and obtained
support
2.1 Music Festival
pre-preparation
(the
process of working hours of the specific
arrangements for music festival, see appendix I)
(1) contact XX record and
get the strong support from UK president, Mr. CC,
several well-known
XX concert singer
and the band's friendship performances, and
equipment and stage design will be
helped by the company XX;
(2) Musician and the initial selection
of works;
1
(3) media outreach and promotional
program development.
2.2 Media support
(1) news: newspapers, magazines,
television, radio, network;
(2) The special programs recording:
Greenwich music, light, live entertainment media
coverage,
DD TV
.
更多精彩内容来自
文星论文网
2.3 Music Festival of the device
support
Sound,
lighting,
stage
built
by
the
era
of
XX
support
(has
been
made
in
Mr.
Xu
Xiaofeng's
approval).
(1)
Schedule of the preparatory work of Music Festival
(A) Prior to May 1: the planning stage
(B) May 1 to May 30: Review
and approval work and the sponsorship support of
the acquisition,
the media heat to
supplement the application simultaneously, while
the details of implementing the
promotional materials, to perform a
specific process program, venue arrangements, to
defend the
fire
crowd
dispersal
medical
care,
power
supply,
traffic control,
liaison
with
other colleges
and
universities in areas such as the
details. At the same time urged to arrange for a
band rehearsal, as
well as simulation
performance.
(C) June 1 to
June 13: Start a formal campaign.
(D) June 14: to build the stage.
(E)
June
14
(Friday)
18:30-22:30
formal
performance started
(if
the weather changes,
extended
day).
更多精彩内容来自
文星论文网
(2) the organization of the festival
(A) proposed the formation
of Music Festival: director, Xu Xiaofeng Chen
Shaofeng as a teacher;
consultant,
from
experienced
and
interested
in
serving
as
a
student;
producer,
management,
personnel
training
class
office
and
four
analog
co-implementation;
Asian
Games
Organizing
Committee will be
formed by all the students together.
(B)
The
first
simulated
system companies
to
adopt
the
project
activities,
and
proposed
to
FF's
students for the first
simulation of a basic charge of this project were
to first simulate the basis of
company
personnel
to coordinate
the
participation
of
all
students.
Organizing
Committee
of
the
important
basic work, from the class of common coordination
and cooperation of the division of
labor to complete; performances,
ranging from Warner to guide all students have
completed.
2.4 We have the
edge
(1) Understanding our
own favorite music, lifestyle, passion for
original music;
(2)
familiar with the college music dynamics, and
Greenwich colleges and universities of the band,
music, have long-term stay in touch;
(3)
organized
the
experience
of
similar
activities,
with
music
festivals
organized
all
kinds
of
professional persons;
(4) and television media, print media,
Internet media, the close relationship;
(5) Greenwich University
brand.
2
Part3 Outdoor
Performance Solutions
3.1
The pros and cons of performances analysis indoor
and outdoor
(A) funding
approach. The best place for performances is the
large indoor auditorium, Rent Range
£
10000.
Outdoor
venue costs should
be
not
much,
but
significant
increase
in
costs
is
mainly
security, fire
fighting, medical care, fire and medical work was
being prepared in advance to lay a
good
greeting,
security
is
expected
to
be:
50
people
for
the
regular
police
force
×
£
200
=
£
10,000, 50
security personnel ×
£
100 =
£
5,000, totaling
£
15,000.
(B)
operation
difficulty
approaching.
When
the
show,
an
indoor
show
of the
cumbersome
and
there is no security
considerations, but must deal with all aspects of
the relationship between the
processing,
the
handling
of
the
relationship
between
schools
up
and
down,
brothers,
relations
between
the
institutions
up
and
down
the
handling
of
all
aspects
of
the
relationship
between
friends
in
the
media
processing,
etc.
and
so
on,
a
little
lax
in
the
future
work
in
this class
may
cause
unnecessary trouble. In
the
outdoor
performances,
these current weakness
of
our
research
skills problems can be avoided, the
main face is the possibility of various expected
and emergency
treatment, more of these
specific issues drawback is that detailed and
complicated, and advantages
of is easy
to handle and more suitable for students to
complete. Weigh pros and cons, indoor and
outdoor performances, in the operation
rather difficult.
更多精彩内容来自
文星论文网
(C)
the
effect
of
publicity,
shows
much
different results.
For
a
station
close
to campus
life
and
close to the students
for the music festival, indoor performances limit
the partic
ipation of students,
the festival into a music venue, news
is limited; outdoor show a pattern of open, easy
to create a
participatory atmosphere,
the media are also more interested in attention
training
is beneficial to
the overall promotion. Therefore, the
outdoor performances is the preferred solution.
3.2 The primary
key issue of the outdoor performance is the
security
(A)
right
to
defend
the
work
of
artists.
Performances
were
mainly
due
to
the
composition
of
student singers, as long as the
singer's rest areas are protected, no problem. For
the guest singer, to
take someone to
escort the way to defend the department in the
school under the coordination of
security can be guaranteed. If it is in
Greenwich Park activities, large auditorium lobby,
as well as
audio-visual lecture hall is
a temporary lounge to choose from. If you are one,
one choice of venue
is a temporary
lounge.
(B)
audience
safety.
By
working
with
the
police
station,
and
step
up
patrols
to
defend
the
department
to
control
the
performance
time,
do
a
good
job
working
the
crowd
dispersal,
the
normal safety issues can
be guaranteed.
(C) Fire
issues: enhancing the power of management,
specifically responsible for supervision of
electrical equipment
in
preparation for part of the fire equipment, and
the fire department to lay
hello, the
problem can be prevented.
(D) Medical
issues: to get
in touch with the university hospital in advance,
can basically ensure
readiness.
Part 4 Planning of
activities
3
4.1 task type
(1) approval of the task.
To
strive the students’ sup
port. How to be
conducted is by the GG teacher
to guide
the completion. Strive to be completed by May 20.
Options: to perform at the Greenwich
University of Physical Education.
(2) registration, rehearsal
and programming tasks. Responsible for organizing
the application by
hand,
repeatedly rehearsed to ensure the quality of the
performances. With communication with
the
Warner
is
also
responsible
for
the
implementation
of
guest
singers,
in
the
May
20
program
prior to the
implementation of a single, easy to banners,
posters, brochures production.
(3)
media
to
promote
the
task.
Consists
of
two
parts,
first,
media
coverage
of
the
negotiations
work, May 30 to complete; Second, a
formal campaign in full swing, June 1 to June 13.
(4) sponsorship to promote
the task. Need to be completed by May 20 to ensure
that a variety of
advertising posters,
and so the production of carriers.
(5)
The
General
Security
Service
work.
Responsible
for
developing
the
power,
security,
fire
fighting,
health
insurance
plans,
May
20
to
complete;
to
negotiate
with
relevant
departments
to
implement
a
specific
work
plan
towards
the
completion
of
May
30
(including
power
supply
security
work
and
strive
to
implement
prior
to
May
20).
During
the
performance,
monitor
the
implementation of specific work.
(6) The site layout tasks.
Warner is responsible for liaison with
the design June 14 venue layout
program
staff in advance with regard to the coordination
of Warner, 20 to 30 May to implement
programs such as the venue lighting
sound; formulate
plans take Taiwan can
be considered June
11
Japanese
take
Taiwan,
14-day
audio
and
video
lighting
layout.
After
the
performance, while
helping
to inventory items, demolition packing.
(7) The venue coordination
role. Projections show the various problems that
may occur during the
organization of
the provisional commando to deal with emergencies.
(8)
summed
up
finishing
the
task.
Music
Festival
planning,
preparing,
during
the
log
keeper
responsible for the collection, and
afterwards the final report.
(9) the overall coordination role.
Those concerning the economic activity contracted,
conferences,
etc., as well as the
coordination of the smooth progress of various
tasks.
4.2 The
process time-frame diagram
(appendix I)
4.3 Staff input
program (preliminary proposal)
(1)
The
Organizing
Committee
is
responsible
for
overall
coordination
of
tasks,
venue
co-
ordination tasks, by HH, II as a director, to
serve as assistant to the director
Y
ong, manager of
the
company composed
of
four
members
of
simulation.
Preliminary
work
by
JJ,
KK,
LL,
MM
co-
organization and coordination, while the students
in conjunction with the relevant examination
and approval for the completion of the
work.
Organizing Committee consists of
promote the Finance
Department,
promotion of the General
Department.
(2)
sponsorship
to
promote
the
Finance
Department
is
responsible
for
completing
the
task
sponsors
to promote the need to participate in the design
ad carriers to develop referral plans, to
raise
sponsorship,
financial
management.
Suggested
that
NN
(undergraduate
in
accounting)
and
share the responsibility for the
Organization's human.
(3)
performing
arts
organizations,
venues
Department,
responsible
for
the
completion
of
4